The energy code is not a homeowner's problem. It is your builder's.
Energy compliance is a required submittal on the building permit application, which means the builder is the party who has to demonstrate to the building department that your house meets it. If the envelope does not comply, that is a conversation between your builder and the City, not between you and anybody.
So it is worth knowing what your builder is actually signing up to.
Idaho adopted the 2018 code, then amended it down
Idaho has adopted the 2018 International Energy Conservation Code, amended by the state and collectively called the Idaho Energy Conservation Code.
Those amendments matter, because in three specific places Idaho relaxed the model code rather than tightening it. Twin Falls County sits in climate zone 5. Here is the comparison.
Requirement | Model 2018 IECC | Idaho amendment |
|---|---|---|
Fenestration U-factor | 0.30 | 0.32 |
Ceiling R-value | R-49 | R-38 |
Air leakage | 3 ACH50 | 5 ACH |
Wood frame wall | R-20 or R-13+5ci | R-20 or R-13+5 |
Floor | R-30 | R-30 |
Basement wall | R-19 or R-15ci | 15/19 |
Crawl space wall | R-19 or R-15ci | 15/19 |
Slab | R-10, 2 ft | R-10, 2 ft |
Glazed fenestration SHGC | NR | NR |
The walls, floors, basements, crawl spaces and slabs are unchanged. The ceiling, the windows, and the air tightness target are all less demanding than the model code they came from.
A note on confidence. These values come from published compilations of the Idaho rule, and two independent sources agree on the row: a compilation of Idaho's building statutes and administrative rules and a state redline draft of IDAPA 24.39.30, the latter carrying unresolved reviewer flags on this very table. Model code values are from a published climate zone 5 code comparison. We are publishing the numbers because nobody else has, and we are telling you plainly to confirm the currently adopted values with your building department before anyone designs to them.
The blower door rule nobody mentions
This is the provision that genuinely falls on your builder, and it is specific.
Under Idaho's amended air leakage section, beginning July 1, 2021, the building thermal envelope of at least 20 percent of all new single-family homes built by each builder must comply with both the installation requirements and the testing requirements. The remaining 80 percent may use either testing or visual inspection.
In plain terms: one in five of your builder's houses gets a blower door test. Not one in five rooms, one in five houses, measured across that builder's work.
The threshold is tested air leakage of less than 5 air changes per hour, measured with a blower door, with testing conducted in accordance with RESNET/ICC 380, ASTM E 779 or ASTM E 1827.
A few practical details from the same provision:
- The test happens after rough-in and after penetrations for utilities, plumbing, electrical, ventilation and combustion appliances are installed.
- Windows and doors are closed but not sealed, interior doors are open, HVAC is off, and continuous ventilation and heat recovery openings are closed and sealed.
- The permit holder chooses the verification method at the time of permit application. Testing or visual inspection, decided up front.
- Where visual inspection is used, the items in the code's inspection table have to be field verified, and the code official can require that the air barrier and insulation be inspected by an approved party independent of the insulation installer.
- The authority having jurisdiction may waive the requirement where significant testing consistently shows air changes below the limit.
Worth asking your builder which method they chose on your permit, and whether your house is one of the tested ones.
Two compliance paths, and the choice has consequences
Energy compliance is demonstrated one of two ways, and the City of Twin Falls submittal list names both: prescriptive values noted on the site plan, or a ResCheck performance calculation.
Prescriptive means every assembly meets its number from the table. Simple, predictable, inflexible. If one assembly falls short, you fix that assembly.
Performance lets the building be evaluated as a whole, so a stronger assembly can offset a weaker one. That flexibility is useful when a design feature conflicts with a prescriptive value, for example a large area of glazing, or a cathedral ceiling that cannot physically hold R-38.
The practical difference for you is that the performance path can preserve a design decision the prescriptive path would force you to change. It also costs a bit more in documentation. That is a builder's call and it should be a deliberate one, not a default.
The slab adder people miss
One item that is not in the table above.
A heated slab requires R-5 insulation under the full slab area, in addition to the slab edge requirement. On a 2,400 square foot slab that is 2,400 square feet of rigid foam that an unheated slab would not need.
It is the kind of thing that never appears in a phone quote and cannot be added later. We covered it in more detail in the radiant floor heat post.
What this means if you are worried about heating
Here is the honest answer to a question we get a lot, usually phrased as whether some particular heating system will work at these temperatures.
The envelope decides more than the equipment does. With a 0 to 2 degree winter design temperature depending on which jurisdiction you are in, a house that loses heat slowly is comfortable with modest equipment, and a house that loses heat quickly is uncomfortable with any equipment.
And notice what the numbers above actually tell you. Idaho's code allows R-38 in the ceiling where the model code asks for R-49, and allows 5 air changes per hour where the model code asks for 3. Those are the two biggest levers on heat loss in a cold climate, and the code floor sits below the model code in both.
Which means the code is a minimum, not a target. Building to R-49 in the ceiling and chasing a tighter number than 5 ACH are both available to you, both cost real money during construction, and both are far cheaper now than as a retrofit. That is a conversation to have while the walls are open.
One more mandatory item
Easy to forget: Idaho's amended code includes a mandatory lighting provision requiring that at least 75 percent of the lamps in permanently installed lighting fixtures be high-efficacy, or that at least 75 percent of the fixtures contain only high-efficacy lamps.
Rarely an issue with modern fixtures. Occasionally an issue with decorative ones.
What to ask your builder
- Are we using the prescriptive path or ResCheck, and why?
- What ceiling, wall, and window values are we actually building to?
- Is my house one of the 20 percent that gets blower door tested?
- Which verification method did you choose at permit application?
- If we exceed code on the ceiling and air sealing, what does that cost?
- If the slab is heated, is the under-slab insulation in the number?
Question five is the one worth asking seriously. Code minimum is a floor, and in Idaho that floor is lower than the model code it came from.
Building in the Magic Valley?
We build custom homes, additions, ADUs, shops, remodels, and barndominiums across Twin Falls, Jerome, Kimberly, Buhl, Filer, Burley, Rupert, and unincorporated Twin Falls County.
We are the party on the hook for energy compliance on your permit, and we will tell you what we are building to, where it sits relative to the code minimum, and what it costs to do better. If the honest answer is that your money is better spent on the envelope than on the equipment, we will say so.
We are a registered Idaho contractor, RCE-65510, insured and warrantied.
Tell us about your project → or call (208) 731-1729
Idaho amendment values above are drawn from published compilations of IDAPA 24.39.30, including a state redline draft that carries unresolved reviewer annotations on the climate zone table. Model 2018 IECC values are from a published code comparison. Confirm the currently adopted requirements with the department issuing your permit before designing or pricing to any of them. Energy compliance calculations are the responsibility of the designer or the party preparing the submittal.
Frequently asked questions
Who is responsible for energy code compliance? The builder. Energy compliance documentation is a required submittal on the building permit application, so the builder demonstrates compliance to the building department.
What insulation does Idaho require in climate zone 5? Published compilations of the Idaho amendment show R-38 ceiling, R-20 or R-13+5 wood frame wall, R-30 floor, 15/19 basement wall, 15/19 crawl space wall, R-10 slab to 2 feet, and a fenestration U-factor of 0.32. Confirm current values with your building department.
Is Idaho's energy code stricter than the national model code? Not in every respect. Idaho's amendment allows R-38 in the ceiling where the model 2018 IECC asks R-49, a window U-factor of 0.32 where the model asks 0.30, and 5 air changes per hour where the model asks 3.
Does my house get a blower door test? Possibly. Idaho's amendment requires that at least 20 percent of each builder's new single-family homes meet both the installation and testing requirements, with the remainder using testing or visual inspection. Ask your builder which applies to your house.
What is the air leakage limit? Tested air leakage of less than 5 air changes per hour with a blower door, tested per RESNET/ICC 380, ASTM E 779 or ASTM E 1827, after rough-in and after utility penetrations are installed.
What is the difference between the prescriptive path and ResCheck? Prescriptive means every assembly meets its table value. ResCheck evaluates the building as a whole, so a stronger assembly can offset a weaker one. The performance path can preserve a design feature the prescriptive path would force you to change.
Should I build to code minimum? Code is a floor. In Idaho that floor is below the model code on ceiling insulation and air tightness, which are the two largest levers on heat loss in a cold climate. Exceeding it costs money during construction and almost nothing to live with.